Petrochemical Pipe Rack & Interconnecting Piping
Jubail Industrial City · 1,850 t
Services
Our own erection crews, riggers and supervision — taking your package from delivered steel to installed and signed off.
Fabricating well and erecting badly wastes the effort. We keep erection in-house so the crew installing the steel answers to the same management that built it.
Every critical lift has a documented lifting plan, reviewed and signed before mobilisation. Riggers, banksmen and crane operators hold current third-party certification.
We close out with survey verification, punch-list clearance, touch-up coating and a complete as-built record package.
Recent work
Jubail Industrial City · 1,850 t
Second Industrial City, Dammam · 640 t
Yanbu Industrial City · 310 t
Start a Project
Send us the drawings or the specification and we will come back with a price and a schedule.