Skip to main content

Piping & Pipe Racks

Petrochemical Pipe Rack & Interconnecting Piping

Client
Confidential — Petrochemical Operator
Location
Jubail Industrial City
Sector
Petrochemical
Discipline
Piping & Pipe Racks
Fabricated Weight
1,850 t
Duration
14 months
Year
2024
Completed
November 2024

Overview

A 620-metre main pipe rack corridor connecting two process units, fabricated in modules and erected across a live plant with restricted crane windows.

The scope combined heavy structural steel with carbon and stainless process piping, cable tray supports and access platforms. Modules were pre-assembled and pre-tested in our Dammam yard, then transported as complete units — cutting on-site work to a fraction of the original programme.

Working within an operating facility meant every lift was planned around production. Not a single shutdown hour was attributable to our scope.

Scope of Work

  • 620 m of primary and secondary pipe rack steel
  • Carbon and stainless process piping to ASME B31.3
  • Modular pre-assembly and pre-testing off site
  • Cable tray supports and access platforms
  • Erection within a live operating facility

Project Gallery

Start a Project

Have a similar scope?

Send us your drawings and we will come back with a price and a schedule you can build a programme around.