Pressure Vessels

ASME Pressure Vessel Package — Refinery Upgrade

Client
EPC Contractor — Refining
Location
Yanbu Industrial City
Sector
Oil & Gas
Discipline
Pressure Vessels
Fabricated Weight
310 t
Duration
11 months
Year
2024
Completed
August 2024

Overview

Nine coded pressure vessels for a refinery capacity upgrade, comprising separators, knock-out drums and two stainless-clad reactors.

All equipment was fabricated under our ASME U-Stamp authorisation, with post-weld heat treatment, full radiography on longitudinal and circumferential seams, and hydrostatic testing witnessed by the client and an independent inspection agency.

The stainless-clad reactors required strip-lining and dissimilar-metal welding procedures qualified specifically for this contract.

Scope of Work

  • Nine ASME VIII Div 1 coded vessels
  • Separators, knock-out drums and clad reactors
  • Post-weld heat treatment and full radiography
  • Witnessed hydrostatic testing
  • Complete manufacturer's data reports