Skip to main content

Structural Steel

Station Canopy & Space Frame Structure

Client
Main Contractor — Public Infrastructure
Location
Riyadh
Sector
Infrastructure
Discipline
Structural Steel
Fabricated Weight
480 t
Built Area
6,100 m²
Duration
9 months
Year
2025
Completed
June 2025

Overview

An architecturally exposed space frame canopy over a public transport interchange, where the steelwork is the finished surface rather than something to be hidden.

Exposed structural steel carries a different standard: weld profiles are ground and blended, tolerances are tighter, and the coating system is specified for appearance as much as protection. Every node was trial-assembled in the shop before dispatch.

Erection ran overnight in short possessions to keep the interchange open throughout construction.

Scope of Work

  • Architecturally exposed structural steelwork
  • Space frame nodes trial-assembled in shop
  • Ground and blended weld profiles
  • Appearance-grade coating system
  • Overnight erection in short possessions

Project Gallery

Start a Project

Have a similar scope?

Send us your drawings and we will come back with a price and a schedule you can build a programme around.