Structural Steel

Logistics Hub Structural Steel Frame

Client
Developer — Industrial Estates
Location
King Abdullah Economic City
Sector
Industrial & Logistics
Discipline
Structural Steel
Fabricated Weight
1,420 t
Built Area
19,500 m²
Duration
12 months
Year
2024
Completed
September 2024

Overview

Primary and secondary structural steel for a three-building logistics hub, including cross-dock canopies and a two-storey administration block.

Delivery was sequenced building by building so erection could begin on the first structure while the third was still in fabrication — compressing the overall programme by roughly four months against a sequential approach.

All steel was shop-primed and finish-coated after erection to protect connection surfaces during handling.

Scope of Work

  • Primary and secondary steel for three buildings
  • Cross-dock canopies and loading bays
  • Two-storey administration block frame
  • Sequenced delivery to compress the programme
  • Shop priming with post-erection finish coat