Modular Steel Structures — Northwest Development

Client
Main Contractor — Giga Project
Location
Northwest Region
Sector
Infrastructure
Discipline
Modular & Skids
Fabricated Weight
1,180 t
Duration
13 months
Year
2025
Completed
July 2025

Overview

Repeatable modular steel units for a remote-site development, engineered for transport over long distances and rapid assembly with minimal site labour.

Working 1,100 km from our shop made transport geometry a design driver: every module was sized to standard trailer envelopes and detailed with bolted splices so no site welding was required on the primary frame.

A full trial assembly of the first three modules was carried out in our yard and witnessed by the client before series production began.

Scope of Work

  • Repeatable modular steel unit design
  • Sized to standard road transport envelopes
  • Bolted splices — no primary site welding
  • Witnessed trial assembly before series production
  • Long-haul logistics and site assembly support

Project Gallery

Start a Project

Have a similar scope?

Send us your drawings and we will come back with a price and a schedule you can build a programme around.