Piping & Pipe Racks

Desalination Plant Piping & Skids

Client
EPC Contractor — Water
Location
Jeddah, Makkah Province
Sector
Water & Desalination
Discipline
Piping & Pipe Racks
Fabricated Weight
760 t
Duration
10 months
Year
2024
Completed
May 2024

Overview

Process piping, duplex stainless spools and pre-assembled dosing skids for a reverse-osmosis desalination facility.

Seawater service meant duplex and super-duplex stainless throughout the high-pressure sections, fabricated in a segregated bay with dedicated tooling to eliminate carbon steel contamination. Ferrite content was verified on every production weld.

Dosing and CIP skids were built complete with instrumentation, wired and function-tested in our shop, then delivered ready for hook-up.

Scope of Work

  • Duplex and super-duplex stainless spools
  • Segregated fabrication to prevent contamination
  • Ferrite verification on production welds
  • Pre-assembled dosing and CIP skids
  • Shop wiring and function testing